A591 Repairs

Following the exceptional weather of Storm Desmond in December 2015. Cubby Construction and Kier Highways worked collaboratively to provide a robust economic solution to a 106m damaged section of road to strategically reconnect Cumbria, under a unique arrangement between Cumbria...

A66 Bank Protection, Bassenthwaite

De-vegetation of a large area of steep sloping ground, installation of ground reinforcement to prevent soil slip whilst protecting a reed bed and the adjacent Lake from contamination caused by the works.

Revetment Walling & Re-Routing, River Lyvennet, Cumbria

The project included the restoration of the River Lyvennet back into its former channel. The construction of a new river channel – following the ancient course - through wooded area and open land. The work also required construction of a...

A66 Construction of Layby & Flood Protection, Bassenthwaite

Construction of a raised road level and new layby on the A66 and the shore of Bassenthwaite Lake, installation of flood drainage to minimise flood disruption to traffic on this Sir William Pitt designated National strategic link road. Creation of...

M6 – Surface Water Cascades

A concrete construction of cascades designed to divert and allow drainage of surface water at the side of the M6 motorway.