A591 Repairs

Following the exceptional weather of Storm Desmond in December 2015. Cubby Construction and Kier Highways worked collaboratively to provide a robust economic solution to a 106m damaged section of road to strategically reconnect Cumbria, under a unique arrangement between Cumbria...

A66 Bank Protection, Bassenthwaite

De-vegetation of a large area of steep sloping ground, installation of ground reinforcement to prevent soil slip whilst protecting a reed bed and the adjacent Lake from contamination caused by the works.

Cavaghan & Grey Factory

The works comprised a new manufacturing process at Cavaghan and Gray’s Carlisle factory which required significant changes to the internal space within a large steel-framed section of the plant.

Willowholme

New Carriageway and Footpath reconstruction at Willowholme Industrial Estate, Carlisle.  

Sheepmount Weir

Construction of a new bark access road to prevent damage to the roots of the existing trees and the extraction of the existing sheet pile weir.

A66 Construction of Layby & Flood Protection, Bassenthwaite

Construction of a raised road level and new layby on the A66 and the shore of Bassenthwaite Lake, installation of flood drainage to minimise flood disruption to traffic on this Sir William Pitt designated National strategic link road. Creation of...

M6 – Surface Water Cascades

A concrete construction of cascades designed to divert and allow drainage of surface water at the side of the M6 motorway.

Precast Bases Glossop To New Mills

Cubby, LSTC and Omexon worked together on the feasibility of this project. While the structures are by no means large the inclining steel legs and associated bracing meant the works were complex.